Projects

580MW National Independent Power Plant Projects (NIPP)

This project involved Construction Kaiser Limited as the Main Civil Contractor and thereafter engaged for the Mechanical, Electrical & Plumbing Installation for the Balance of Plant (BOP). The project involved civil construction works for 5 Gas Turbine/Generator Pedestals, each in 450 cubic metre of grade 40 concrete in single/straight pour with 52 tons of steel reinforcement in each pedestal. The Central Control building on 3 upper levels with 2700 sq.m gross floor area was also constructed.

On this same project, we handed over the civil works for the 330KV Switchyard meat to serve the 580MW power generation. This Switchyard project consist of 450 pedestals for the Switchyard towers, 1400 metres of cable trenches.

A total of 900 metric tons of structural steel erection was also carried out for the Gas Turbine Canopy, Workshop & Warehouse, Oil Water Separator Area and the Fuel Gas Station.